Small hydro
URIEL began its operations in this technology with the development and construction of a fluent small hydroelectric plant of 4.8 MW in the Arga River, which started operations in April 1993. Subsequently URIEL developed and built two more fluent power plants of 2.9 and 6.4 MW which are in operation since 2009 and 2011 respectively.
Having more than 20 years of experience in the operation, as well as the development and construction activities of the hydro power plants owned by URIEL, make URIEL a reference in this technology.
Proyectos Mini Hidráulica
Project name | Country | Region | Installed capacity (MW) | Status |
---|---|---|---|---|
C.H. Sarría I | Spain | Navarra | 6.4 | In operation |
C.H. Sarría II | Spain | Navarra | 4.8 | In operation |
C.H. Sarría III | Spain | Navarra | 2.9 | In operation |
Buy now
You can now buy this awesome Joomla Theme directly on Themeforest for a really low price for this awesome and stunning Joomla product!
Nulla vitae elit libero, a pharetra augue. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Etiam porta sem malesuada magna mollis euismod. Morbi leo risus, porta ac consectetur ac, vestibulum at eros. Nulla vitae elit libero, a pharetra augue.
Login
×Register now
I'm a small Introtext for the Register Module, I can be set in the Backend of the Joomla WS-Register Module.
×